Load Testing for Overhead Crane

Prior to operating an overhead crane or a spreader bar OSHA requires a Load Test to be performed. 29 CFR 1910.179 K states it will be at 125% of the rated capacity. Thanks to all involved in loading and unloading … Continue reading

Posted in Below the Hook, Crane Inspection, Customer, Load Testing, OSHA, Overhead Crane, Overhead Crane Inspection, Sling | Tagged , , , , | Leave a comment

OSHA Removes Capacity Requirement May 21

OSHA Removes Capacity Requirement May 21, 2018 — As expected, OSHA has removed from its rule the requirement for crane operators to be certified according to the capacity of the crane. Contact Joe at CCTI for full details. http://www.cranetraininginternational.com http://ow.ly/8uU230k71op