Load Testing for Overhead Crane

Prior to operating an overhead crane or a spreader bar OSHA requires a Load Test to be performed. 29 CFR 1910.179 K states it will be at 125% of the rated capacity.

Thanks to all involved in loading and unloading the test weights and the actual load test.

Contact us if you are in need of spreader bars manufactured, overhead cranes and load testing.

 

2018-03-05 10.01.522018-03-05 09.46.492018-03-05 09.38.132018-03-05 09.24.122018-03-05 09.24.022018-03-05 08.44.582018-03-05 08.44.212018-03-05 08.43.162018-03-05 10.25.582018-03-05 10.00.342018-03-05 10.01.46

About CrewsCrane

President/CEO of CCTI, Inc. providing Crane, Hoist, and material handling training. Inspections, service and parts for Mobile and overhead crane. General and Construction Industry for 10 & 30 hr OSHA courses, aerial/scissor lifts, and forklift. Inventory of Hoists, Slings and Below the Hook Devices.
This entry was posted in Below the Hook, Crane Inspection, Customer, Load Testing, OSHA, Overhead Crane, Overhead Crane Inspection, Sling and tagged , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s